HomeInternational Journal of Multidisciplinary: Applied Business and Education Researchvol. 4 no. 8 (2023)

Contract Management System among Selected Construction Companies in Qatar

Gerelyn S. Dela Cruz | Mark Anthony N Polinar

 

Abstract:

The State of Qatar's construction industry proliferates, attracting international investors and contractors to large-scale projects. This growth, however, is accompanied by an inevitable increase in claims and disputes, causing significant delays and additional costs to the project. The study’s focus is to understand better the practical problems affecting the contract management system’s efficiencies in selected construction companies in Qatar. A descriptive correlational research design method was carried out using a survey questionnaire to determine the degree of importance and awareness of the contract management system in terms of risk, change, and claim management. Also, the results revealed that employees perceived risk, change, and claim management as integral parts of the contract management system. A Pearson correlation coefficient was used to test the correlation between the variables covered in the study, and the statistical evidence concluded that there is a significant strong linear relationship between the degree of importance and awareness in the contract management system. Therefore, based on the literature presented in this study and the data gathered from fifty-two respondents who voluntarily participated in the survey, the authors recommended that the organizations must embrace these contract management methods to cut costs, shorten lead times, and boost profitability: clear dispute resolution procedures, precise change control procedures, proper record keeping, effective risk mitigation plan, competent team members, and the organization's capability and readiness to resort to arbitration when other dispute resolution procedures are exhausted.



References:

  1. Ahmadisheykhsarmast, S., & Sonmez, R. (2018). Smart contracts in the construc-tion industry. 5th International Project and Construction Management Confer-ence (IPCMC2018).
  2. Asian Development Bank (2021). Contract management guidance note on procure-ment. http://dx.doi.org/10.22617/TIM210515-2
  3. Chan, D. W. M. & Kumuraswamy, M. M. (1996). An evaluation of construction time per-formance in the building industry. Build-ing and Environment, 31(6), 569-578.
  4. Contract Solutions Group Arcadis (2018). Global construction disputes report 2018: Does the construction industry learn from its mistakes?
  5. Babirye, H., Oosthuizen, N., & Tait, M. (2023). The process of contract compliance: A public procurement perspective. South African Business Review, 26, 21. https://doi.org/10.25159/1998-8125/11565
  6. Bakhary, N. A., et al., (2015). A study of con-struction claim management problems in Malaysia. Procedia Economics and Fi-nance, 23, 63 – 70
  7. Briggs, I. T. F. (2022). Contract management and performance of infrastructural pro-jects in Rivers State. Diamond Bridge Economics and Business Journal, 2(2).
  8. Changali, S., Mohammad, A., & Nieuwland, M. (2015). How to build megaprojects bet-ter. [https://www.mckinsey.com/capabilities/operations/our-insights/the-construction-productivity-imperative], accessed on 17 July 2023.
  9. Carmichael, D. G., & Tran, H. (2012). Contrac-tor’s financial estimation based on owner payment histories. Organization, Tech-nology & Management in Construction: An International Journal, 4(2), 481–489.
  10. Chovichien, V., Tochaiwat K. (2006). Infor-mation system for managing employer’s construction claims. 87–91
  11. Chukwu, E. L., & Zubairu, U. M. (2023). Project performance in the global construction industry during the covid-19 era. Europe-an Project Management Journal, 13(1). https://doi.org/10.56889/iltz2026
  12. Eriksson, P. E., & Westerberg, M. (2017). Ef-fects of procurement on construction project performance. In International Conference on Management of Technolo-gy, 5(9)
  13. Festus, A. O. (2021). Factors influencing claims management practices in Nigerian con-struction industry. FUTY Journal of the Environment, 15(2).
  14. Gunduz, M., & Elsherbeny, H.A. (2020). Practi-cal implementation of contract admin-istration performance model in Qatar construction projects. International Con-ference on Civil Infrastructure and Con-struction.
  15. Hayati, K., Latief, Y., & Rarasati, A.D. (2019). Causes and problem identification in con-struction claim management. IOP Pub-lishing Ltd, doi:10.1088/1757-899X/469/1/012082.
  16. Hao, Q., Shen, W., Neelamkavil, J., & Thomas, R. (2008). Change management in con-struction projects. National Research Council Canada, NRCC-50325.
  17. Jarkas, A. M., & Mubarak S. A. (2016). Causes of construction change orders in Qatar: contractors’ perspective. International Journal of Project Organization and Man-agement, 8(3), 275-299.
  18. Kenpro. (2021, November 8). How to Conduct Likert Scale Analysis. https://www.kenpro.org/how-to-conduct-likert-scale-analysis/
  19. Kibogo, A. D., & Mwangangi, M. (2017). Fac-tors affecting contract management in public procurement sector in Kenya: A case of Kenya literature bureau. Europe-an Journal of Business Management, 1(110), 377-384.
  20. Leith, A (n.d.). Effective contract management and administration: key considerations. Retrieved March 23, 2023, from https://www.tamimi.com/law-update-articles/effective-contract-management-and-administration-key-considerations/
  21. Mohamed, H.H., Ibrahim, A.H., & Soliman, A. A. (2014). Reducing construction disputes through effective claims management. American Journal of Civil Engineering and Architecture, 2(6), 186–196
  22. Mwendwa, M.M., (2019). Influence of contract management practices on performance state of Kenya corporations in Kenya. In-ternational Journal of Supply Chain and Logistics, 3(1), 50-75.
  23. Njoki, G.C., Ismail, N., & Osoro, A. (2021). Ef-fect of contract management on perfor-mance of state corporations in Kenya. In-ternational Journal of Academic Research in Business & Social Sciences, 11(5), 13-24, DOI:10.6007/IJARBSS/v11-i5/9853
  24. Oluwajana, S. M., Ukoje, J.E., Okosun, S.E., & Aje, I. O. (2022). Factors affecting time and cost performance of road construc-tion projects in Nigeria. African Journal of Applied Research, 8(1), 72-84. http://doi.org/10.26437/ajar.03.205
  25. Mordor Intelligence Industry Reports. Qatar Construction Market Analysis [https://www.mordorintelligence.com/industry-reports/qatar-construction-market/market-size#:~:text=Qatar%20Construction%20Mar-ket%20Analysis,period%20(2023%2D2028)], accessed on 17 July 2023
  26. Pearson Correlation Coefficient Calculator. [https://www.socscistatistics.com/tests/pearson/default2.aspx], accessed on 29 July 2023
  27. Pogorilich, D. A., (1992). The daily report as a job management tool, cost engineering, 34(2), 23-25.
  28. Saeed, Y.S. (2018). Cost and time risk man-agement in construction projects. Tikrit Journal of Engineering Sciences, 25(1), 42-48, DOI: http://dx.doi.org/10.25130/tjes.25.1.07
  29. Sabiel, A.I. (2020). The role of formal risk management practices in construction project’s success: a case study of Qatar. ProQuest LLC 28263291.
  30. Sah, S.K. & Bhattarai, S.K. (2021). Study of inef-ficiencies in contract management prac-tice in rural road. Journal of Advanced Re-search in Civil and Environmental Engi-neering, 8(3&4), 1-8. https://orcid.org/0000-0003-4194-6508
  31. Sharma, S. & Gupta, A.K. (2019). Risk identifi-cation and management in construction projects: literature review. International Journal of Humanities, Arts and Social Sciences, 5(6), 224-231, doi: https://dx.doi.org/10.20469/ijhss.5.20002-6
  32. The World Bank. Procurement Guidance Con-tract Management Practice (2018). 1st edition. Washington.
  33. Unegbu, H. C. O., Yawas, D. S., & Dan-asabe, B. (2021). Assessment of the relative im-portance and relationships of project management practices for the construc-tion industry in Nigeria. Proceedings on Engineering Sciences, 3(1), 65-80, doi: 10.24874/PES03.01.007
  34. Zaremba, Y. (2022, June 9). What is contract compliance? [https://blog.axdraft.com/contracts-101/what-is-contract-compliance/#:~:text=What%20does%20compliance%20mean%20for,the%20contract's%20terms%20and%20conditions], ac-cessed on 15 July 2023